We don't just need to map things, but we also need to keep the map up to date as things change. For Public Rights of Way, it can be slow for any official changes to make their way onto the Definitive Map and then be picked up by mappers. There is already legislation that allows various organisations the right to receive copies of the legal orders that effect changes to Public Rights of Way. The list is contained in Schedule 6 of the Wildlife and Countryside (Definitive Maps and Statements) Regulations 1993: http://www.legislation.gov.uk/uksi/1993/12/schedule/6/made (I think this is the latest version).

Now we have a formal organisation for OSM in the UK, I'd really like to see OSM-UK CIC being added to the list of statutory receivers. Hopefully we could then make the information supplied more publicly available. Do other people agree, and would any of the Directors be interested in taking this up and lobbying Government for a change at some point (presumably after the election now)? I'd be happy to get involved with this and draft any letters etc.

RobJN

I'd really like to see OSM-UK CIC being added to the list of statutory receivers.

Do we know what this takes?

Robert Whittaker

Presumably one would need to convince the relevant Secretary of State that it was a good idea, and get them to amend/re-issue the Statutory Instrument linked above that includes the list. From the introductory text, it looks like it's jointly the SoSs for the Environment and Wales.

Brian Prangle

We've decided to take this on and I've rashly volunteered to lead this. My thinking on how we should approach this is first to contact each of the organisations who are already on the list and ask

  1. Were they added at the time the legislation was passed or subsequently?
  2. If subsequently, do they know the procedure?
  3. How is the data provided to them?
  4. What licence terms does it have? 5.If it's open data would they be willing to share it with us until we get on the list?

Brian Prangle

I've just sent the following email to 2 of the organisations listed (Ramblers Association and Cycle Touring Club). I've also sent a similar email to Natural England. Let's see what happens

There is legislation that allows various organisations the right to receive copies of the legal orders that effect changes to Public Rights of Way. I believe this is itemised under Schedule 6 of the Wildlife and Countryside (Definitive Maps and Statements) Regulations1993.
http://www.legislation.gov.uk/uksi/1993/12/schedule/6/made
Your organisation is one of those listed and I would like your help.
OpenStreetMap has an active interest in mapping PRoWs and we have just incorporated as a legal entity in England 9 OpenStreetMap UK CIC Ltd) so I would like to know the process for an organisation to be added to the list. Any help you can give would be greatly appreciated.
Also we're curious as to what form and what volume these changes are communicated to you. And finally would your organisation be prepared to share your data obtained under this legislation with us, until such time as we can receive it directly

Robert Whittaker

FYI, I emailed CTC/Cycling UK and the British Driving Society society with something similar in the middle of June (they seemed to be the two most recently added organisations). I haven't had any replies yet.

Possibly of note though is http://www.cyclinguk.org/local-cycle-campaigning/traffic-regulation-orders which (amongst other things) lists (at least some) Public Path Orders and Definitive Map Modification Orders. But the filing organisation of them doesn't make it very easy to search, and the most recent entries seem to be from April 2014.

Robert.

Brian Prangle

Responses received to date on statutory access to PROW changes:

Natural England

Having checked with DEFRA about the process of adding organisations to the list in Schedule 6 of WACA 1981, they will be updating procedure regulations as part of the Deregulation Act rights of way reforms package and note that this would be a time to address your request. However, they also note that the package is deregulatory in nature and is meant to reduce burdens on Highways Authorities and would like to question what OSM’s rational is in being added to the list?

I have responded that our rationale is to have one national reference source for confirmed changes only as an aide to on-the-ground mappers in keeping our online map up-to-date. Consequently we will not be making representations about proposed changes ( other organisations already perform that role) and will only be interested in confirmed cahnges

Ramblers Association

"We receive the notice (DMMO) and then we will receive a follow up which says that the order was either not confirmed or confirmed. This can happen either electronically or through the post. They have to let us know if it was not confirmed but there is no obligation for them to let us know if was confirmed although we normally do receive confirmations. We then enter them on to the Countryside Access Management System database."

They are not able to share this data with us due to resource limitations

Background Information supplied by Ramblers Association

The history of this goes back to the 1980s. At that time, any highway authority or planning authority seeking to divert, extinguish or create a public right of way (footpath, bridleway, byway open to all traffic or road used as public path) had to publish notice of the proposal in that great official organ of state, The London Gazette.

Publishing a notice in The London Gazette is a costly business, and by the 1980s, Her Majesty’s Stationery Office was cheerfully trousering about 10 guineas per line. It is hard to describe a proposal to divert a right of way in only a very few lines, given all the grid references, and all the east-north-easts and west-south-wests: and this requirement eventually caused local authorities, through their representative organisations, to lobby the then Department for the Environment for a change in legislation. The local authorities had to their advantage the scarcely-answerable point that if anybody in all the earth reads The London Gazette (itself a debatable point), it is hardly likely to be the average user of an affected public right of way. So the local authorities had a point, and the Department proposed the abolition of the requirement for order-making authorities to place notices in The London Gazette, except for a very few types of proposal (in particular, applications by highway authorities to the magistrates’ court under section 116 of the Highways Act 1980 for the extinguishment of certain types of highway; but these are relatively rare).

As you may suppose, the user-groups (who despite the contention by local authorities that nobody read it) tended to monitor The London Gazette so as to alert their local representatives to potentially adverse proposals, opposed the move. By ‘user-groups’ I mean inter alios the likes of the Ramblers’ Association, the Open Spaces Society, the Trail Riders’ Fellowship, the British Horse Society and the Cyclists Touring Club (as Cycling UK was then known, before they shortened themselves to CTC). So through a body known as the Rights of Way Review Committee, a non-statutory committee chaired by a parliamentarian and which represents users, landowners, land managers and local authorities, representations were made that if the requirement to advertise in The London Gazette was to be dropped, then some other means of making user-groups aware of proposals needed to be introduced.
Prescribing of certain bodies
Ministers accepted this; and so it came about that since 1 March 1983, the date on which came into force Schedules 15, 16 and 17 of the Wildlife and Countryside Act 1981 and the Regulations contained in statutory instruments 1983 Nos 21, 22 and 23, the Ramblers and other organisations are ‘prescribed’ organisations to be served notice of certain proposals.
The relevant ‘notifiable’ proposals are—
• all proposals governed by Schedule 6 to the Highways Act 1980, i.e orders under section 26 (creation of public rights of way), section 118 (extinguishments), section 118A (level crossing extinguishments), section 118B (extinguishments for security in schools and certain designated ‘high crime’ localities), section 119 (diversions in the interest of the owner, lessee or occupier of land crossed by a path, or in the public interest), section 119A (level crossing diversions), and section 119B (diversions for security in schools and certain designated ‘high crime’ localities);
• all proposals governed by schedule 14 to the Town and Country Planning Act 1990, i.e orders to stop-up or divert paths for planning purposes under sections 257, 258 and 261;
• and all proposals governed by Schedule 15 to the Wildlife and Countryside Act 1981, to modify the definitive map by the addition or deletion of public rights of way or to show them of a different status than show, under section 53(2) and section 53(3) of the 1981 Act.
Each of the Schedules just mentioned has a sub-paragraph which says (something like) that the notice published by the order-making authority must be served on ‘such other persons as may be prescribed in relation to the area in which the land is situated’. That is where the prescribed organisations come in. See for example sub-paragraph (3)(b)(iv) of Paragraph 1 of Schedule 6 to the Highways Act 1980. By ‘prescribed’ is meant ‘prescribed by the Secretary of State.’
And the ‘prescribing’ is done by Regulations made by the Secretary of State. With regard to ordinary Highways Act orders, the Regulations are now the ones called The Public Path Orders Regulations 1993 SI 1993 No 11, with the level-crossing-related ones called The Rail Crossing Extinguishment and Diversion Orders Regulations 1993 SI 1993 No 9. For planning law proposals it is The Town and Country Planning (Public Path Orders) Regulations 1993 SI 1993 No 10, and for definitive map proposals it is the Wildlife and Countryside (Definitive Maps and Statements) Regulations 1993 No 12.

Each set of regulations has a regulation applying the Schedule to the relevant Act to the regulations themselves, e.g the Public Path Orders Regulations (which as mentioned above apply to the Highways Act 1980) has a Regulation 3(2) which provides that ‘The persons on whom notice is required to be served under [paragraph 1(3)(b) of schedule 6 to the Highways Act 1980] shall in relation to the areas specified in column 1 of Schedule 3 to these Regulations include the persons specified in column 2 of that Schedule. Then if you look at Schedule 3 to say the Public Path Orders Regulations, you will see two columns, one which has got certain areas of land described, e.g Cheshire, Derbyshire, Greater Manchester, Lancashire, Merseyside, South Yorkshire, Staffordshire and West Yorkshire, the other of which has against that collection of authorities the words ‘Peak and Northern Footpath Society’. Meanwhile for the whole of England and Wales are listed the Ramblers, the Open Spaces Society, the CTC, et alii.

Since it is the Secretary of State who does the prescribing, I think that any organisation wishing to be prescribed would need to make representations to the Secretary of State for the Environment, Food and Rural Affairs at his address at Nobel House, 17 Smith Square, London SW1P 3JR.

Notification
Whatever form of communication is used, order-making authorities must send us a copy of the notice of the making of an order. The order must state the general effect of the order and specify a date (allowing at least 28 days, or 42 for modifications of the definitive map and statement) for the receipt by them of representations or objections. The notice must be accompanied by a copy of the order itself, including a plan drawn to prescribed scale.
There appears to be no requirement to notify the prescribed organisations if the order is subsequently confirmed, unless they have requested to be notified in each case. We made a ‘blanket’ request at the time of being prescribed to be notified of all confirmations. We do not know if we would have legal redress if the ‘blanket’ request is not honoured, since the legislation seems to mean specific requests per order. But we think that most order-making authorities notify us of the confirmation of orders. It appears that notice of decisions not to confirm must be given to prescribed bodies without their requesting to be notified.
Until electronic communication was possible, we got a foot-high pile of paperwork in the post every day. Now much of it comes electronically, which makes life easier for my colleague who deals with the orders. This is done by recording certain details on a database here (though not a scan of the documentation, for which we haven’t the resources), and then forwarding it to nominated local representatives throughout England and Wales for them to assess the merits of the proposals. We rarely intervene from here in a proposal unless we have by chance spotted some fatal error of drafting in which case we usually let the order-making authority know so they can deal with it before the matter progresses much further and cannot be solved without major embarrassment to them.

Brian Prangle

Given the responses we've had from Natural England and the Ramblers' Association warning us of the volume of data they receive and their struggle to keep on top of it, especially the complexities of confirmations and non-confirmations of DMMOs, we feel as a Board that we'd struggle even more as an organisation given our state of immaturity and thus we're proposing that we drop this project unless anyone is prepared to volunteer to deal with the data load. It would be very embarrassing to get prescribed access and then fail to deal with the consequences! It seems better at this stage either to continue to approach each Local Authority, or to make links with local Ramblers' Assocations. I'll add a suitable proposal for voting in a few days

Cancel PROW project

proposal by Brian Prangle Closed Sun 24 Sep 2017 9:29AM

Given the feedback from organisations about the volume and complexity of data and the absence of comment from OSMUK members since the last post, this project should be cancelled as an OSMUK project and mappers should rely on developing contacts at a local level

Results

Robert Whittaker
Agree

I think it's a shame, but I reluctantly agree.

Paul Oldham
Abstain

I think it's a shame we couldn't persuade the Rambler's Association to let them share the output from their database as they're already doing all the hard work to produce a list of confirmed orders.

Gregory Marler (former Director)
Agree

It would be good to revisit this in maybe 2-5 years. Either with the intention of becoming a statutory receiver backed up by us having the tech/peopel resources to use it, or perhaps lobbying for more easier/visible/open updates by the govt.

Jon Harley
Abstain

It seems like a big loss. Suppose we call it "shelved" rather than cancelled, to give ourselves time to think about how we could get to the point where we would be able to handle this data?