QGIS 3.0 Soft Feature Freeze

Tim Sutton PublicSeen by 29

Please refer to the previous discussion on the developer list for more context on this discussion. This thread is to determine when the feature freeze for 3.0 will take effect. The following items are currently listed as exempt from the freeze:

According to our proposal the freeze status will be voted on a fortnightly basis.

The soft freeze should be continued for another two weeks.

proposal by Tim Sutton Closed Wed 29 Nov 2017 10:03PM

Please vote AGREE if you agree to continue the soft freeze for another two weeks and DISAGREE if you desire the soft freeze to be terminated and no new features admitted into the 3.0 code base.

For some context, here are the latest updates from Nyall:

Here's the updates to the work granted soft freeze exemptions, which
occurred over the last 2 weeks (*just to my knowledge, not
authoritative!)

  • Processing SAGA provider: merged!
  • Processing GRASS provider: merged!
  • Datum transform refactoring: PR for the core changes is open, but needs in depth review by at least 2 core developers. GUI component is being worked on by Denis, but is blocked by the core PR.
  • Layouts: still WIP - all existing item types have now been ported (but not merged to master yet), so I've just got a few remaining functions to port (exporting, saving, templates)
  • Metadata store: PR has been reviewed, waiting on required changes to be made
  • Forms & fields gui rework: merged!

So we're a lot closer than two 3 weeks ago :)

Results

Werner Macho
Agree

Better be sage and include everything we need for 3.0 than be sorry and have to change something again and again and again ..

Hugo Mercier
Abstain

Not an easy one. Of course I'd like to see all the good features landing in QGIS 3. But I also think we need to make users confident about our ability to respect a delivery schedule

Werner Macho
Agree

Better be safe and include everything we need for 3.0 than be sorry and have to change something again and again and again ..

Shall we continue the soft freeze for two more weeks?

proposal by Tim Sutton Closed Mon 18 Dec 2017 10:09PM

Please see https://www.loomio.org/d/38Aiya0q/3-0-soft-freeze-exemptions for any other incoming exception requests. I can report that the metadata write support will be done by the end of the next freeze cycle if it is approved.

Results

Tim Sutton
Agree

Hopefully this will be the last one?

Borys Jurgiel
Agree

This time we're really close! \o/

Mathieu Pellerin
Agree

Looks like we might not need another extension if the pace doesn't change, great!

Werner Macho
Agree

I'm with the others .. This should be the last extension. We're close to have everything included and at some point should come to an end and fullfill the predictions we do for our "professional" users

Shall we continue the soft freeze for two more weeks?

proposal by Tim Sutton Closed Thu 4 Jan 2018 7:34PM

Please see https://www.loomio.org/d/38Aiya0q/3-0-soft-freeze-exemptions for any other incoming exception requests.

Results

Nyall Dawson
Abstain

Unsure... Final two PRs are in for layouts work (and will hopefully be merged before this poll expires!). Can we get a status report on the remaining metadata work?

Tim Sutton
Abstain

@nyall the metadata work we were hoping to have done before the xmas break. Etienne is just finishing up the file system read/write support - I hope he will have it within the next week or so. Any plans for ATLAS support in 3.0?

Mathieu Pellerin
Disagree

I think we've reached a point where we sounds terminate the soft freeze and declare its use a success story. The vote-every-two-weeks method turned out to be a great way to give devs flexibility while avoiding a total absence of ETA altogether.

Alessandro Pasotti
Agree

I think that we'd benefit from at least one more week: the layout PR is not yet completed and there might be are other PRs in the queue that worth a closer look.

Alexander Bruy
Abstain

IMHO we can move to the hard freeze if remaining pull-requests will be reviewed and merged in reasonable time

Borys Jurgiel
Agree

After long thinking, +1 for the very last time, so Nyall and Etienne have a bit more flexibility with last minute changes. Other PRs seem to be a bit abandoned, so I hope it won't really postpone the release.

Mathieu Pellerin

I've also tested the other PR (upgrading 2.x composers to layouts) and found it to work very well too.